shape

Indian Mining Site

Reliance Petroleum required staff accommodation and administration quarters and sought a low cost solution that would deliver fast results.

The structures which included 700 rooms, all built to client specification, were completed on budget in a record time of 90 days by the Indian manufacturer.

Indian Qpanel was used in the construction of walls and roofs on the project which was located in Jamnagar, India.

These buildings withstood a cyclone in 1998 with winds reaching 200km/h.

The buildings remain undamaged.

shape